Akyikatchy Dzhamilia Dzhamanbaeva visited pre-trial detention center-5 in Osh city

29/09/2023 - 10:01

Akyikatchy (Ombudsman) Dzhamilia Dzhamanbaeva during a working visit to Osh and The Osh region was visited by pre-trial detention center-5 in the city of Osh.

Akyikatchy, accompanied by the management of pre-trial detention center-5, got acquainted with the conditions keeping prisoners in this closed institution.

At the time of the Ombudsman’s visit, there were 367 people in this institution

prisoners, 500 places in total.

A random inspection of the chambers revealed that in one chamber designed for four people, there were 8 prisoners.

The mayor's office showed all the blocks of the closed institution where they  are located. prisoners. There was no one in the PLS block - the prisoners had recently been transported.

Akyikatchy, together with the leadership of pre-trial detention center-5, selectively entered the cells and talked to prisoners about their rights.

In general, prisoners did not complain about their living conditions. But they asked protect their rights in court.

Everywhere the cells felt damp; the building of pre-trial detention center-5 was very old and dilapidated.

Based on the results of the tour of the cells, the Akyikatchy and the management of the pre-trial detention center-5 discussed the data Problems.

“As you know, the building of pre-trial detention center-5 is old, it was built in the 1890s, here Alymbek’s son, a Danish woman, Kamchybek, was also detained,” employees reported Akyikatchy institutions.

Dzhamilia  Dzhamanbaeva calls on the Cabinet of Ministers to speed up the resolution of the issue about the deployment of pre-trial detention center-5 outside the city.

“The conditions of detention of prisoners in pre-trial detention center-5 do not meet the established standards requirements. This is a violation of human rights. In this regard, it is urgent, I recommend speeding up the construction of a new building for pre-trial detention center-5 below the line city,” said the Ombudsman.

According to the authorities, this closed institution is included in the list objects that need to be moved outside the city. Currently the question of choosing a place where a new one will be built is being considered pre-trial detention center.

Next, the Ombudsman visited the temporary detention center of the Osh Department of Internal Affairs to familiarize herself with the conditions keeping prisoners. The temporary detention center is located on the ground floor of the police department.

One of the detained women, who introduced herself as a lawyer, complained to violate her rights.

She was detained under the article “Hooliganism”. The Akiykatchy listened to her complaint and for a long time had a conversation with her.

The temporary detention center staff reported that she was brought in half an hour before the visit.

Ombudsman of the temporary detention facility. In other cells, detainees did not complain about the conditions content. The head of the Osh city police department told Akyikatchy about the measures, adopted to ensure respect for the rights of citizens.

In addition, the woman whose case is being handled by the Institute was not in the pre-trial detention center.

Ombudsman. We are talking about K.A., who was detained at the Bishkek airport and transported to Osh.

According to the pre-trial detention center staff, she was sent to the Osh temporary detention center for investigative events. However, she was not in the temporary detention center in Osh at the time of the Ombudsman’s visit of this institution. The pre-trial detention center employees assured that she was transferred in the evening before visits by the Ombudsman to the pre-trial detention center.

Let us note that earlier, in early September, the mother of the detainee reported to the media that police officers, in violation of her daughter’s rights, detained her women have a baby.

According to the police, the woman was wanted and was detained under Article 209 of the Criminal Code of the KR.

After visiting the pre-trial detention center, Akyikatchy showed how the construction of the new A pre-trial detention center that is being built outside the city. So, in the village council of Tash-Bulak In the Suzak district, a new pre-trial detention center is being built on the Aral site.

1 hectare of land has been allocated for the construction of a pre-trial detention center. On this site is being built four-story building designed for 200 places, the object corresponds established standards for pre-trial detention centers.

The construction of an administrative building is also planned. Completion construction of a new pre-trial detention center, according to employees of the State Penitentiary Service, is planned for end of 2023.